Home - Business Categories - Onshore Pipeline
Onshore Pipeline

China Petroleum Pipeline Engineering Co., Ltd. (CPP) has participated in more than 130 oil and gas pipeline projects at home and abroad since 1973, and accumulatively constructed over 100,000 kilometers, of which more than 20,000km were built abroad. CPP is able to construct long-distance pipelines transporting crude oil, natural gas, refined oil and other medium. Moreover, pipeline ancillary facilities such as valve stations, compressor stations, and professional non-excavations such as horizontal directional drilling, shield tunneling, aerial crossing and pipe jacking are also within the capability of CPP.

West-East Gas Pipeline Project (Phase I)

1.jpg

Client: China National Petroleum Corporation

Route: Starts from Xinjiang Tarim oilfield in northwestern China, through Gansu, Ningxia, Shanxi, Shanxi, Henan, Anhui, Jiangsu, and ends at Shanghai in southeastern China.

Total Length: 4000km

Diameter: 1016mm

Scope: Survey, feasibility study, preliminary design, EPC

Duration: 2002-2004

West-East Gas Pipeline Project (Phase II)

QQ截图20170804172337.jpg

Client: China National Petroleum Corporation

Route: Starts from Horgos, Xinjiang in western China, through Gansu, Ningxia, Shanxi, Henan, Hubei, Jiangxi, Hunan, Guangdong, Guangxi, and ends at HongKong in southern China.

Total Length: 9102km

Diameter: 1219mm

Scope: Survey, feasibility study, preliminary design, EPC

Duration: 2008-2012

West-East Gas Pipeline Project (Phase III)

2.jpg

Client: China National Petroleum Corporation

Route: Starts from Horgos, Xinjiang in western China, through Gansu, Ningxia, Shanxi, Henan, Hubei, Hunan, Guangdong, ends at Fujian in eastern China.

Total Length: 7378km

Diameter: 1219mm

Scope: Survey, feasibility study, preliminary design, EPC

Duration: 2012-2014

The Eastern Siberia–Pacific Ocean (ESPO) Crude Oil Pipeline Project Phase I

1.jpg

EPSO Phase I starts from Taishet in Irkutsk, and reaches to Tengda in Amur, with a total length of 2,600 kilometers.CPP constructed the segment of 170 kilometers between Tengda and Aldan, which traverses through virgin forest and swamps at above 50°N with seismic intensity above 8, and the average temperature on site was -40℃with the lowest temperature down to -64℃during November to February.

The Myanmar-China Crude Oil and Gas Pipelines Project

Client: CNPC Southeast Asia Pipeline Company and CNPC Pipeline Construction Company

1.jpg

Route: The crude oil pipeline starts from Mandaly Island in Myanmar and the gas pipeline starts from Kyaukpyu, Lanta Island at Myanmar’s western coast. The two pipelines run in parallel through several Myanmar Provinces, such as Rakhine, Magu, Mandalay and Shan, before entering into China at Ruili City, Yunnan Province, and then traverse through Guizhou, Guangxi and Chongqing provinces and finally separate at Anshun in Guizhou province, where the oil one goes to Chongqing and the gas one to Guangxi.

Total Length: 4992km

Diameter: 813mm for oil and 1016mm for gas pipeline

Scope: Survey, feasibility study, preliminary design, EPC

Duration: 2010 to 2013

The Central Asia-China Gas Pipeline (Line A, B & C)

1.jpg

Client: CNPC Central Asia Gas Pipeline Company

Route: Starts from Turkmenistan, through Uzbekistan and Kazakhstan, and ends at Horgos in China, which provides gas for China’s West-East Gas Pipeline(Phase II and III).

Total Length: 3630km in total of parallel Line A&B; 1621km of Line C

Diameter: 1067mm

Scope: Survey, feasibility study, preliminary design, EPC

Duration: 2008 to 2009

Pipeline Projects in Sudan

苏丹管道工程.jpg

China Petroleum Pipeline Engineering Co., Ltd.(CPP) have built four pipeline Projects as EPC contractor in Sudan: 1506km pipeline at Blocks 1/2/4, 723km pipeline at Block 6, 172km pipeline at Block 5B, and 242.2km of section A1 and 77km of section B2 at Blocks 3/7. These pipelines go through various terrains including tropical rain forest, the Sayarra desert, the Nile river, and the Red Sea hills.

Abu Dhabi Crude Oil Pipeline Project

阿联酋阿布扎比原油管道项目.jpg

The consortium of CPP and CPECC (China Petroleum Engineering Construction Corporation) constructed the Abu Dhabi crude oil pipeline project in UAE. The pipeline begins from Habashan Oilfield in Abu Dhabi, the United Arab Emirates, and ends at Fujairah Port where crude oil is shipped abroad, with its design capacity of 1.5 million barrels per day.

The 48” pipeline with a total length of 305km includes13 valve stations, traversing through various terrains such as saline-alkali soil, sand dunes, Gobi and mountains. Within this project, ten 169,000m³ floating roof tanks were erected in the first and terminal stations.

Ahdeb Crude Oil Pipeline Project in Iraq

伊拉克艾哈代布项目.jpg

Located in Iraq’s southwest, Ahdeb oil field is the first one opening for international cooperation after wars. Line 4, constructed by CPP, runs 190 kilometers from Nasiriyah Depot in the west to Tuba Tank Farm in the east. The X60-garde 42” pipeline with the thickness of 12.7mmincludes six valve stations, one solar system and two sets of CP system, and in its first and final station, there are respectively equipped with pig launcher/receiver station, various valve chambers and electrical systems.

Halfaya Gas Export Pipeline

哈法亚气管线项目-(2).jpg

The Halfaya Gas Export Pipeline Project (GEXL) was the first pipeline transporting wet sour gas built by CPP.

The project was mechanically completed on October 28, 2012, and the gas receiving station was put into operation on February 11, 2013.gas has been successfully supplied to the downstream power plants since February 17, 2013.

GEXL was the first project in Missan Province that utilized natural gas resources for civil power generation. It transferred the wet sour natural gas from Central Processing Facility (CPF1) in oilfield through the new 24-inch pipeline to Gas Receiving Station (GRS), where gas is separated, filtered, heated and metered before sent to the Khala power plant to feed gas turbines, and the separated condensate is sent back from GRS to the CPF1 via a 3-inch pipeline. The project was awarded to CPP on November 21, 2011.

Block H Crude Oil Pipeline in Chad

Chad block H crude oil pipeline runs311 kilometers long from block Block H to N'Djamena refinery, and possesses an initial station at central processing facility (CPF) in Block H, Ronier Oilfield, one terminal station in N'Djamena refinery, and 8 valve stations, of which there are 3 RTU valve stations, 5 common valve stations, and 4 cathodic protection stations.

乍得H区块原油管道项目.jpg

This API 5L X60 HFW pipeline with the diameter of 406.4mm is designed as 100×104t/a, which may reach 300×104t/a in future and its design pressure is 10MPa. This project has adopted a process that the crude oil is heated at CPF and transported through airtight pipeline with no heating stations along the line.

The project has won gold medal of petroleum quality project in 2014, and 2013-2014 national quality engineering award (international projects).

AGADEM Oil Field Crude Oil Pipeline in Niger

This Project is the first long-distance pipeline in Niger, and was awarded to CPP.

尼日尔AGADEM油田原油管道工程-(2).jpg

It starts from AGADEM Oilfield in northeastern Niger and runs462.5 kilometers southwest towards the downstream refinery near ZINDER, with a diameter of 323.9mm. Along this pipeline, FOC was laid in the same ditch, and 7 various stations were constructed including one initial station, two heating and pigging stations, three heating stations, and one terminal station, as well as six block valve stations. A total of thirteen standards are involved in for the work of process, pipeline, general plans, structure, construction, electricity, communications, instrumentation, water supply & drainage and firefighting, HVAC, thermal, mechanical and anti-corrosion.

The project won the Gold Award of 2013 Petroleum Quality Project.

The Lanzhou-Zhengzhou-Changsha Product Oil Pipeline

Client: China National Petroleum Corporation

Route: Starts from Lanzhou in western China, through Shanxi, Henan, and Hubei Province, and ends at Changsha in eastern China.

Total Length: 3105km

Diameter: 219mm -660mm

Scope: Survey, preliminary design, EPC

Duration: 2007 to 2013

The Shanxi CBM (Natural Gas) Pipeline

山西煤层气.jpg

Client: Shanxi Gas Industry Group Co., Ltd.

Route: Traversing through 305 villages of 71 towns in 22 cities of Shanxi Province.

Total Length: 1049km

Diameter: 273mm to 711mm

Scope: Survey, feasibility study, preliminary design, EPC

Duration: 2011 to 2014

The Hunan Natural Gas Pipeline Network Project

6-管道穿越优美的水稻田.jpg

Client: Hunan Natural Gas Co., Ltd.

Location: Changsha, Yueyang, Loudi, Shaoyang and Liuyangin Hunan Province

Total Length: 173.2km

Diameter: 219mm- 323mm

Scope: EPC

Duration: 2016 to 2017